None of the existing pilots for the innovation credit apply – for a specific certification project, the detailed data will be provided
Façade Contractor ask for a rectification of this quality issue.
- 1.
Подрядчик по фасадным работам просит/попросил уточнить спорный вопрос о качестве.
translation added by Tatiana OsipovaGold en-ru
according to WB design assumptions, an additional factor of 1.15 has been considered for the dead load of the steel in order to take into account connections and stiffners.
краска вспучилась (отслоилась, вспузырилась)
я больше склоняюсь к мнению...
- 1.
I tend to lean more towards the view that...
translation added by Andrew GalatinSilver ru-en - 2.
I'm inclined to think ...
translation added by Tatiana GerasimenkoGold ru-en - 3.
I tend to think that...
translation added by Руслан ЗаславскийGold ru-en
A separate EPDM joint does not affect the technical application of the design intent.
EPDM joints
keders
- 1.
Кедер- канты
translation added by Yuri DDDBronze en-ru
Application reinforcement
ETFE
- 1.
ЭТФЭ-полимер
translation added by Yuri DDDBronze en-ru